Volsyn Energy
Volsyn Energy
Synergize Every WattHarmonize A Net-Zero World

VOLSYN

Rooftop Solar + BESS Project Investment Application

Confidential – For Investment Assessment Only

Contact

Name
Email
Phone / WhatsApp / WeChat

Part 1: Asset Overview

Asset postcode
Asset type
Year built
Gross floor area (m²)
Usable roof area (m²)
Ownership

Part 2: Grid Connection & Consumption (Critical Section)

⚠ Please provide the last 12 months electricity bills if possible.

Grid connection
Current connection capacity (kVA / MVA)
Main transformer capacity (kVA)
Has limited capacity ever affected your operations?
Have you applied for a capacity upgrade before, or do you plan to apply in the future?
Has the DNO ever refused your request or required reinforcement/upgrade fees?
Electricity consumption
Annual electricity consumption (MWh)
Average monthly consumption (MWh)
Peak load (kW)
Can provide 15/30-min load profile?
Operational profile
Runs 24/7?
Has low-load periods?
Has seasonal peaks (e.g. holidays)?
Electricity contract structure
Current electricity supplier
Contract type
Contract end date
Pays capacity (demand) charge?
Exposure to high peak DUoS (Red band)?

Part 3: Roof & Structure (Technical Feasibility)

Roof type
Roof load capacity (if known)
Has structural inspection report?
Roof refurbished recently?
Any shading/obstructions (HVAC, chimneys, etc.)?

Part 4: Operations & Stability (Investment Stability)

Company founded year
Last 3 years performance
Is a 3rd-party logistics provider (3PL)?
Has long-term customer contracts?
Plans to relocate within 3–5 years?

Part 5: Energy Optimisation & Cooperation Willingness

Electricity cost as % of OPEX (approx.)
Has ESG / decarbonisation targets?
Willing to sign long-term PPA (10–15 years)?
Accept zero-CAPEX model (we invest; share savings)?
Allow BESS dispatch for market optimisation (no impact on ops)?

Part 6: Compliance & Insurance

Allow third-party installation of energy equipment?
Any insurance restrictions?
Any fire safety / planning constraints?

Part 7: Future Expansion

Plans to expand buildings?
Plans EV fleet / chargers?
Considering backup power upgrade?

Attachments (if available)

Last 12 months electricity bills
Load profile curve
Roof drawings / structural plans
Lease contract (if applicable)

Allowed: PDF/PNG/JPG/XLSX/CSV, suggested max 30MB each.

Notes

All information is used only for investment assessment and will be kept confidential.